The SWS-PowerBox® makes electricity from the wagon’s own motion.
The cold chain is the first application; other loads that need energy on the wagon follow the same principle. Two builds of the same system, the Tower for retrofits on fleets already in service, the Underframe for new wagons and full rebuilds.
“With SWS-PowerBox®, we provide environmentally friendly power supplies for wagons that work.”
VTG Wagon keeper · IntermodalNews, Sep 2024
“It is the only real sustainable way to transport reefer containers.”
Rail Innovators Group On power wagons built around SWS technology · RailFreight.com, Feb 2025
For more information about our products, we are always happy to hear from you.
Rail works differently in every market. Rather than shipping from Graz into the world, we work with established rail suppliers on the ground, they build and service the PowerBox in their region.
The largest rail freight market in the world, and the one place the cold chain still moves almost entirely by road. Our partners on the ground know the market, its wagons and its operators.
HUSE LIVE, part of Sujan Industries in Mumbai, is our partner for Indian rail: the SWS-PowerBox®, built in India, for Indian conditions.
Freightquip, an established rail supplier with its own workshop equipment and shunting vehicles, brings the PowerBox to Australia and New Zealand, and climbed under the wagon with us to prove it.
Fleet, battery and cargo data are centralised in real time.
Advancing emission-free and autonomous energy solutions in rail freight.
On regular services across Europe, Hamburg–Budapest, Oslo–Narvik and Wrocław–Koper among them, with very different goods. The first units have passed 300,000 kilometres without any major problems.
A reefer container draws about 3.75 kW on average, so an 80 kWh box runs it for roughly 21 hours. Actual consumption sits between 1 and 6 kW depending on the goods, the setpoint and whether humidity control is needed, and the container should already be pre-cooled when it is connected.
Three ways. While the train runs, the wheelset recuperates about 0.13 kWh per kilometre, roughly 615 kilometres to fill an empty 80 kWh box with nothing connected. At the terminal or loading track, a Type 2 plug charges at up to 22 kW, so under four hours, and a CEE 32 socket works via adapter cable.
No. The installation does not affect the clearance gauge, G1 is complied with, and the wagon holds ERA certification. It runs on the European rail network without restriction.
None in the strict sense, operation is simple and every instruction sits on the inside of the service door. We still recommend a short session with the terminals involved, because understanding the system makes crews far more willing to use it.
Humboldtgasse 12 /35
1100 Vienna
Austria
You are welcome to address any complaint directly to the e-mail address above.
Our general terms and conditions apply to every offer, delivery and service. They cover scope, prices and payment, delivery and transfer of risk, warranty and liability, retention of title, and the place of jurisdiction.
The binding, signed version is the PDF below. <!-- TODO: replace with the in-page wording once legal counsel releases the HTML version -->
Download the general terms and conditions (PDF)The protection of your personal data matters to us. Personal data is treated in strict confidence and used only for the purposes you have requested. We process your data exclusively on the basis of the statutory provisions (GDPR, TKG 2021). Below we explain the most important aspects of data processing on this website.
When you visit our website, your IP address and the start and end of the session are recorded for the duration of that session. This happens for technical reasons and constitutes a legitimate interest within the meaning of Art. 6 (1) (f) GDPR. Unless stated otherwise below, we do not process this data further.
If you contact us through the form on this website or by e-mail, the data you provide is stored in order to process your enquiry and to answer follow-up questions, and only for as long as necessary for those purposes. We do not pass this data on without your consent.
This website uses only technically necessary cookies, which do not require consent. These are the cookies needed to operate the website and its functions.
We use the Honeypot service to protect the site against misuse by non-human visitors and to prevent spam. It runs entirely in the background, requires no interaction from you, collects no user data and shares nothing with third parties. Data is only transmitted once the system detects a bot.
With regard to the data we hold about you, you have the right to information, correction, deletion, restriction, data portability, revocation and objection. If you believe that the processing of your data breaches data protection law, or that your data protection rights have been infringed in any other way, you can complain to us at office@sws-ps.com or to the Austrian data protection authority.